Advertisement

Versant Power Planned Electrical Maintenance in Presque Isle on Friday

Planned electrical maintenance on Friday in Presque Isle, ME.
Planned electrical maintenance on Friday in Presque Isle, ME.(Gray tv)
Published: Sep. 23, 2020 at 4:38 PM EDT
Email this link
Share on Pinterest
Share on LinkedIn

PRESQUE ISLE, Maine (WAGM) - Versant Power crews have scheduled work on the electrical system in Presque Isle on Friday, September 25.

The work will begin at 5 a.m., affecting customers on Micmac Drive, Midway Drive, Twilight Drive, Beacon Road, Sunrise Lane, Morningside Drive, Sunset Loop, Summit Drive, Northern Road and part of Edgemont Drive.

Customers may experience service interruptions during this time as crews work to make repairs safely, improve reliability, and prevent future outages.

The public is reminded to never touch a downed power line or a tree in contact with a downed line. Motorists are urged to slow down or move over and change lanes, when possible, if approaching utility crews working on roadways.

Customers who use generators or alternate heating sources are reminded to ensure they are used in accordance with manufacturer guidelines at all times.

Copyright 2020 WAGM. All rights reserved.

Latest News

Latest News